Kaamos, the developer of "Ābeļziedu terases", has already proven its quality standards in other realized projects. This project has also been created based on the knowledge of professionals, innovations in the industry and the latest trends in the choice of decoration. Learn more about technological solutions here:

BUILDING STRUCTURES

FOUNDATIONS AND PLINTH

Pile foundations and a grid of reinforced concrete foundations on which load-bearing walls and cover panels rest.

EXTERIOR WALLS

The wall of hollow concrete blocks is plastered from the inside.
Polystyrene foam thermal insulation.
Decorative plaster.

INTERNAL WALLS

Load-bearing interior walls separating apartments:
hollow concrete block wall, plaster on both sides.

Interior walls of apartments:
high-strength plasterboard sheet with increased moisture resistance and sound insulation properties on both sides, metal frame with mineral wool filling.

Shaft walls in apartments:
2 layers of high strength plasterboard cladding, metal.

Storage walls:
birch plywood on one side to the wooden frame structure.

ROOF

Waterproofing in 2 layers
Dry concrete screed on a slope
Slope-forming thermal insulation layer
Thermal insulation
Vapor insulation
Reinforced concrete cover panels

WINDOWS / BALCONY DOORS

PVC construction, double-chamber glass package.

FRONT DOOR

Aluminum profile, double-chamber glass package.

FACADE FINISH

Exterior wall of the building:
decorative plaster.

Walls at the balconies and entrances to the building:
facade tiles with wood texture.

INTERFLOOR COVERS (FLOORS)

ON THE 1st FLOOR

In the stairwell and lobby (floor on the ground):
tiling;
dry concrete floor with built-in heating pipes;
reinforced concrete floor slab;
vapor insulation;
thermal insulation;
rammed sand.

In common areas:
polished concrete surface;
dry concrete floor with built-in heating pipes;
vapor insulation;
thermal insulation;
waterproofing;
reinforced concrete cover panels.

In apartments:
flooring;
dry concrete floor with built-in heating pipes;
vapor insulation;
thermal insulation;
waterproofing;
reinforced concrete cover panels.

ON THE 2nd to 4th FLOOR

In the stairwell:
flooring;
dry concrete floor;
vapor insulation;
sound insulating layer;
reinforced concrete panels.

In apartments:
flooring;
dry concrete floor with built-in heating pipes;
vapor insulation;
sound insulating layer;
reinforced concrete panels.

BALCONIES

Floor:
precast reinforced concrete balcony slab.

Railing:
industrially painted metal railing with local cement fiber board finish.

Partitions:
cement fiber boards on both sides on a metal frame.

ELEVATOR

One elevator in each building. The carrying capacity of each elevator is 630 kg, 8 persons.

ENGINEERING NETWORKS

HEATING

Central city heating, separate meter for each apartment. Heating in the apartments is provided with heated floors. Heating meters can be read remotely.

ELECTRICAL SUPPLY

An individual electricity control meter for each apartment, located in the electricity distribution room. Automatic fuses in the apartments.

WATER SUPPLY

Central city water supply, separate cold and hot water meter for each apartment. Water meters can be read remotely.

VENTILATION

In apartments, individual ventilation equipment - recuperators with heat recovery function. Air intake and exhaust through grid in the outer wall of the building and kitchen exhaust with exhaust on the roof.

WEAK CURRENTS

Apartments will have intercom equipment. It is planned to install TV and Internet sockets. Smoke detectors will be installed.

INTERIOR DECORATION

WALLS

In the living area and utility rooms – puttyed and painted walls.
In the bathroom – puttyed and painted with moisture-resistant paint, tile finish.
In stairwells and common areas – puttyed and painted walls.

FLOORS

In the living area and utility rooms – parquet.
In the bathroom – tiling, waterproofing.
In stairwells and common areas – tiling.

IN ADDITION

STORAGE FACILITIES

Storage rooms (from 1.8 to 3.9 m2) will be available on the 1st floor.

CLOSED BICYCLE STORAGE

Bicycle storage in a separate building, lockable with a key, intended for placing 18 bicycles. Additional bicycle repair station with bicycle storage under the canopy.

CEILING

In the living area
Reinforced concrete covers, visible panel seams, puttyed and painted. Ceiling height 2.74 meters.
Locally - in places where there are ventilation boxes, cornices, in hallways - puttyed and painted plasterboard ceilings. Ceiling height not less than 2.40 meters.
In the bathroom
Puttyed and painted plasterboard ceiling, built-in lighting elements. Ceiling height not less than 2.40 meters.
In stairwells
Puttyed and painted plasterboard ceiling. Ceiling height not less than 2.50 meters.
At the bottom of the stairwells and mezzanines, the concrete ceiling is puttyed and painted.
In common areas, technical rooms
Reinforced concrete covers treated with anti-dust coating.

PLUMBING

The sanitary units are equipped with appropriate plumbing equipment - a bathtub, a shower trap built into the floor, a sink, a toilet bowl, installed water mixers, built-in connection points for a washing machine.